Free Access
Fig. 14

Download original image
Gaussian process model fit to the RV data of TZ Ari as in Fig. 11, but with the Gaussian process model of the stellar variability subtracted, and folded to the period of TZ Arib (771.36 d).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.