Open Access

Fig. 1.

Fig. 1. Refer to the following caption and surrounding text.

Download original image

Structural layout of the GECAM payload shown from different perspectives and comprising 25 GRDs (designated G01 through G25) and eight CPDs (designated C01 through C08). The payload comprises two main components: the detector dome housing and the EBOX. The payload coordinate system is defined such that the +X, +Y, and +Z axes align with the central normals of detectors G18, G24, and G01, respectively (Zhao et al. 2023c).

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.