Open Access

Fig. 1

Fig. 1 Refer to the following caption and surrounding text.

Download original image

Integrals-of-motion projections for the MW GC sample coloured by our final six-family probabilistic classification. Left: E–Lz plane. Right: E–L. Colours and markers denote the assigned family (see the legend). We define the classification confidence using the maximum posterior probability (pmax) and the probability margin (Δp = pmaxp2nd) between the two most probable classes. Objects are considered secure when pmax ≥ 0.80 and Δp ≥ 0.20, likely when pmax ≥ 0.60 and Δp ≥ 0.10, and ambiguous otherwise. For clarity, cluster names are shown only for the objects with likely or ambiguous classifications (see Table A.1).

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.